
RAJSHAHI, Nov 5: The government is planning a major project to expand the use of Padma river water for irrigation and agriculture in the Barind region, with Agriculture and Fisheries and Livestock Minister Mohammed Aminur Rashid expressing hope that it will receive approval soon.
The project proposal has already been prepared, the minister said while inspecting development activities of the Barind Multipurpose Development Authority (BMDA) in Godagari Upazila of Rajshahi on Thursday morning.
He said strengthening agriculture was essential to strengthening the country's economy, and ensuring fair prices for farmers' produce was a priority for the government.
Agriculture in the Barind region has long depended on groundwater. However, reducing excessive groundwater extraction and increasing the use of surface water were essential, he said.
During the visit, the minister inspected a water extraction and supply system at Hatpara in Godagari, where water is pumped from the Padma through a pontoon-mounted pump. He later visited the Sormongla canal and exchanged views with farmers and BMDA officials. He also took part in a tree plantation programme beside the canal.
The minister subsequently inspected solar-powered and electricity-operated irrigation pumps at Kalipur-3. Officials briefed him on the net metering system, through which surplus solar electricity generated after meeting irrigation needs is supplied to the national grid.
Speaking about the Padma water initiative, Amin Ur Rashid said the government had prepared a major project to expand the system.
“Preparations for the project have already been completed. We hope it will receive approval within the shortest possible time,” he said.
Once implemented, the project would increase the use of surface water in the Barind region, reduce pressure on groundwater and help improve soil fertility through the silt carried by river water, he added.
On solar-powered irrigation, the minister said Prime Minister Tarique Rahman had directed the conversion of around 17,000 deep tube-wells under the BMDA into solar-powered pumping systems.
The initiative would expand the use of solar energy in agriculture. Supplying surplus electricity to the national grid after irrigation would also ensure better utilisation of power, he said.
Earlier, BMDA Executive Director Mohammad Jahangir Alam Khan briefed the minister on the authority's ongoing activities, development projects and future plans.
According to the presentation, the BMDA has 716 deep tube-wells in Godagari Upazila. It has also re-excavated 118 kilometres of canals and water channels and 462 ponds, and constructed 41 kilometres of rural roads. A total of 76,345 farmers have benefited from training and various irrigation activities.
The Sormongla Canal is around 29 kilometres long. The BMDA plans to expand irrigation facilities to around 35,000 hectares of farmland through the canal. Two pumps have been installed to draw water from the Padma.
At the Kalipur-3 solar irrigation project, 45 solar panels have been installed. A 13-kilowatt solar pump supplies irrigation water to 264 bighas of farmland, benefiting 74 farmers. The net metering system also allows surplus electricity to be supplied to the national grid.
BMDA senior officials, representatives of the Department of Agricultural Extension and the Bangladesh Agricultural Development Corporation, local farmers and other stakeholders were present during the visit.