বাংলা E-Paper 📍 Dhaka 📅 Monday | 30 November 2026, 15 Ogrohaeon 1433 PID registration number 06
HEADLINE
Advertisement

Need Proper Planning to Solve Problems in Dhaka, Not Mega Projects

Published : Monday, 30 November, 2026 at 12:00 AM
Barrister Omar Sadat
Dhaka is not merely our capital city; it is a city we love. While we frequently discuss its problems, we rarely view them in an integrated manner. The crisis in Dhaka is not simply a collection of isolated issues but, fundamentally, a crisis of management. Traffic congestion, waste management, waterlogging, mosquito infestations and public safety are all interconnected. A failure in one area inevitably affects others. Therefore, addressing these challenges requires integrated planning and proper management rather than isolated solutions.

Lakes and Waterbodies: Consider the lakes in Gulshan. Without proper maintenance, waste accumulates in them, obstructing the natural flow of water and creating conditions for mosquito breeding. These lakes are not merely aesthetic features; they are vital to the city's environment and public health. Their management should go beyond reinforcing embankments or improving appearances. It must include regular cleaning, proper water flow, monitoring of water quality and ensuring security. Each lake should come under an integrated management framework to maintain environmental balance and improve residents' quality of life. They could even contribute to better urban connectivity.

Mosquito Menace: The mosquito menace is often trivialised, although it directly affects public health, productivity and living conditions. Instead of taking action only after mosquito populations increase, the focus must shift to preventing their breeding. Water accumulating in lakes, drains, construction sites and other places should be monitored regularly, and breeding grounds eliminated. Spraying insecticides and conducting occasional eradication drives cannot provide lasting solutions. This is not the responsibility of city corporations alone. Property owners, construction firms, businesses and citizens must also participate. Regular monitoring, data-driven planning and collective action can help bring the menace under control.

Waterlogging: Even light rain often causes water to accumulate on Dhaka's roads. To address this, canals and waterbodies must be reclaimed from encroachment, their natural flow restored and their connections to rivers re-established. The drainage system also needs greater capacity, regular cleaning and proper maintenance. Dumping waste into drains must stop. This requires public awareness as well as coordinated planning and accountability among the city corporations, Dhaka WASA and the Bangladesh Water Development Board. The potential of alternative technologies should also be explored alongside conventional drainage systems.

Traffic Congestion: We have largely accepted traffic congestion in Dhaka as an inevitable fate. However, many problems could be reduced through better management and relatively small decisions. Introducing one-way traffic on selected roads, regulating entry points and stopping illegal parking could improve the situation without requiring large-scale projects. Traffic patterns also vary across different areas. Some face pressure from offices and commercial establishments, while others experience congestion around educational institutions and markets. Therefore, area-specific traffic data should guide local solutions. 

Saving the time people lose in traffic must be a key objective of urban management.

Road Encroachment: We frequently see drives to clear roads of encroachment, but the situation often returns to normal shortly afterwards. Eviction drives alone cannot provide a lasting solution. Regular monitoring, including CCTV surveillance, is necessary, alongside designated spaces and specific hours for street vendors. Illegal parking must be stopped, multi-storey parking facilities established and public transport given designated stops to prevent passengers from boarding and getting off haphazardly. Such measures can keep roads and footpaths accessible while also considering the livelihoods of hawkers.

Foot-overbridges: Most footpaths in Dhaka are encroached upon, leaving pedestrians with little space to walk safely. A pedestrian-friendly city requires regular monitoring to keep footpaths clear, proper repairs after development work, adequate lighting and shade, and an end to illegal parking. Street vendors may be given designated spaces and specific business hours without obstructing pedestrians.

However, the existence of foot-overbridges does not necessarily mean people will use them. Many are occupied by vendors, lack adequate lighting or have broken stairs and poor maintenance. Using their stairs can be particularly difficult for women, elderly people and those with physical mobility challenges. Some bridges are also located without properly considering people's actual crossing needs. Therefore, they must be built at appropriate locations, kept free from encroachment and provided with regular maintenance and security. People will be more willing to use them when they are safe and convenient.

Waste Management: An organised waste management system requires timely household waste collection, disposal at designated sites and proper final removal. Greater attention should also be given to recycling and producing compost from organic waste. At the same time, the safety and dignity of waste management workers must be ensured, while citizens should act responsibly to keep the city clean.

Parks and Open Spaces: Dhaka urgently needs more public open spaces. Parks are not simply green areas or vacant land; they are important social spaces where children, elderly people and families can spend time. Existing parks must be made functional through regular maintenance, cleanliness and security, while new open spaces should also be created to meet residents' needs.

Ensuring Public Safety: Public safety is often viewed solely as the responsibility of the police, but it requires cooperation among citizens, businesses and the administration. In Gulshan, Banani, Baridhara and Niketan, more than 1,200 CCTV cameras have been installed through private funding with police cooperation. Such surveillance helps detect criminal incidents and identify perpetrators. The possibility of being tracked after committing a crime can also discourage potential offenders. This experience shows that citizen participation, supported by proper leadership and planning, can improve urban security.

Coordination among Agencies: Dhaka’s problems are interconnected, yet the city corporations, RAJUK, police and WASA often operate independently. A lack of coordination weakens their efforts. For instance, renovating roads without addressing drainage or waste management can make drainage improvements ineffective. Information sharing, joint planning, clearly defined responsibilities and accountability are therefore essential. The city must be managed as an integrated system rather than through disconnected projects.

Despair and Potential: Although there are many reasons to feel disappointed about Dhaka, the city also has immense potential. Addressing its problems requires more than building new infrastructure. We must make better use of existing facilities, ensure regular maintenance, improve coordination among government agencies and encourage citizens to participate. Most importantly, decisions must reflect actual conditions and people's needs.

I believe solving Dhaka’s problems does not always require massive projects. Often, sound planning, a sense of responsibility and effective management are what matter most. If these can be ensured, Dhaka can become a city where people do not merely reside but also enjoy comfort and a better quality of life.

The writer is the President of Gulshan Society and a citizens' rights activist


Advertisement
Loading...
Loading...
Advertisement
Editor : Iqbal Sobhan Chowdhury
Published by the Editor on behalf of the Observer Ltd. from Globe Printers, 24/A, New Eskaton Road, Ramna, Dhaka.
Editorial, News and Commercial Offices : Aziz Bhaban (2nd floor), 93, Motijheel C/A, Dhaka-1000.

Phone: PABX- 41053001-06; Advertisement: 41053012; 01793317829, 01550707291, 01550707296
E-mail: [email protected], [email protected]. [email protected], [email protected], [email protected], ‍[email protected], Online-email: [email protected]

🔝